{"id":12173,"date":"2022-02-11T09:46:15","date_gmt":"2022-02-11T08:46:15","guid":{"rendered":"https:\/\/www.seatechnology.eu\/fibre-optics-from-micro-trench-to-reinstatement-in-2-hours\/"},"modified":"2022-02-11T09:46:15","modified_gmt":"2022-02-11T08:46:15","slug":"fibra-ottica-dalla-microtrincea-al-ripristino-in-2-ore","status":"publish","type":"post","link":"https:\/\/www.seatechnology.eu\/en\/fibra-ottica-dalla-microtrincea-al-ripristino-in-2-ore\/","title":{"rendered":"Fibre optics: from micro-trench to reinstatement in 2 hours"},"content":{"rendered":"<p>In Italy the roll-out of fibre optics is still in its early stages, and the number of sites for laying the cables can be expected to grow further in 2022. Road-works companies are therefore called upon to make operational choices that also have a \u201cstrategic\u201d dimension: the excavation techniques they use and the type of machines they have determine the number of sites they can manage.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Traditional excavation <\/strong><\/p>\n<p>Working in the traditional way, i.e. with a mini excavator fitted with a trencher wheel, produces trenches 6 to 10 centimetres wide which, after the cables have been laid, have to be filled with specific materials, such as concrete with admixtures.<\/p>\n<p>In addition, the trencher wheel works dry and, unless it is kept constantly cooled, is likely to have a very short life (20-30 metres of use).<\/p>\n<p>On medium-sized sites, this extends working times. So working times normally of no less than 4 hours for cuts of approx. 20 metres, technical downtime, plus transporting and setting up the equipment: all of this has an impact on the overall budget.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Even more \u201cmicro\u201d micro-trenches<\/strong><\/p>\n<p>The micro-trenching technique is less invasive and faster, as the backfill material required is reduced to as little as 1\/5 compared with traditional excavation, and waiting times between operations are eliminated.<\/p>\n<p>Sea Technology&#8217;s <strong><a href=\"https:\/\/www.seatechnology.eu\/en\/prodotto\/seafloor-501\/\">SEAFLOOR 501<\/a><\/strong> floor saw makes micro-trenches even more \u201cmicro\u201d. Many operators choose to pair it with the 500 mm diameter, 20 mm cutting width <strong><a href=\"https:\/\/www.seatechnology.eu\/demolizione-controllata\/mola-a-battentare-asfalto\/\">grooving blade<\/a><\/strong>, but the 450 diameter, 15 mm width blade also hits the target perfectly.<\/p>\n<p>Fibre-optic ducts are in fact up to 14 mm in diameter and can therefore be inserted simply and safely into a micro-trench 16 mm wide, with an even higher floor saw travel speed and a further reduction in backfill material.<\/p>\n<p>In this way, a couple of hours&#8217; work can be enough to set the machine down on the ground (the dedicated handle makes loading and unloading from the van and handling easier), cut the micro-trenches, lay the ducts and close the trench.<\/p>\n<p>In addition to these operational advantages, there are financial ones: the budget needed to set up a traditional excavation (hire of a mini excavator, trencher wheel and a tipper vehicle for transport to site) is comparable to the purchase cost of the Sea Technology solution.<\/p>\n<p>These are aspects that all companies wishing to seize the opportunities offered by this expansionary phase of the market should weigh carefully: an extremely affordable investment that, in the same amount of time, makes it possible to handle a greater number of jobs on site, with clear benefits for turnover.<\/p>\n<p><em>For further information on our solutions for fibre-optic sites, contact Sea Technology&#8217;s distributors across Italy, or get in touch with us to be referred to the agent nearest you. <\/em><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Gallery<\/strong><\/p>\n<p>The images show a recent site where the <a href=\"https:\/\/www.seatechnology.eu\/en\/prodotto\/seafloor-501\/\"><strong>SEAFLOOR 501<\/strong><\/a> floor saw was paired with the 450 mm diameter, 15 mm cutting width <a href=\"https:\/\/www.seatechnology.eu\/demolizione-controllata\/mola-a-battentare-asfalto\/\"><strong>grooving blade<\/strong><\/a>.<\/p>\n<p>The entire job took approx. 2 hours.<\/p>\n<p>&nbsp;<\/p>\n<div id='gallery-1' class='gallery galleryid-12173 gallery-columns-2 gallery-size-medium'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.seatechnology.eu\/en\/cantiere_seafloor5\/'><img fetchpriority=\"high\" decoding=\"async\" width=\"188\" height=\"300\" src=\"https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor5-188x300.jpeg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor5-188x300.jpeg 188w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor5-640x1024.jpeg 640w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor5-768x1229.jpeg 768w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor5-600x960.jpeg 600w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor5.jpeg 800w\" sizes=\"(max-width: 188px) 100vw, 188px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.seatechnology.eu\/en\/cantiere_seafloor3\/'><img decoding=\"async\" width=\"225\" height=\"300\" src=\"https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor3-225x300.jpeg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor3-225x300.jpeg 225w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor3-768x1024.jpeg 768w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor3-1152x1536.jpeg 1152w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor3-600x800.jpeg 600w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor3.jpeg 1536w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.seatechnology.eu\/en\/cantiere_seafloor2\/'><img decoding=\"async\" width=\"225\" height=\"300\" src=\"https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor2-225x300.jpeg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor2-225x300.jpeg 225w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor2-768x1024.jpeg 768w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor2-1152x1536.jpeg 1152w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor2-600x800.jpeg 600w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor2.jpeg 1536w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon portrait'>\n\t\t\t\t<a href='https:\/\/www.seatechnology.eu\/en\/cantiere_seafloor1\/'><img loading=\"lazy\" decoding=\"async\" width=\"225\" height=\"300\" src=\"https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor1-225x300.jpeg\" class=\"attachment-medium size-medium\" alt=\"\" srcset=\"https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor1-225x300.jpeg 225w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor1-768x1024.jpeg 768w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor1-1152x1536.jpeg 1152w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor1-600x800.jpeg 600w, https:\/\/www.seatechnology.eu\/wp-content\/uploads\/2022\/02\/cantiere_seafloor1.jpeg 1536w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>In Italy the roll-out of fibre optics is still in its early stages, and in 2022 the number of sites for laying the cables can be expected to grow\u2026<\/p>\n","protected":false},"author":3,"featured_media":12864,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[369],"tags":[373,372],"class_list":["post-12173","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-cutting","tag-fibre-optics"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.seatechnology.eu\/en\/wp-json\/wp\/v2\/posts\/12173","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.seatechnology.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.seatechnology.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.seatechnology.eu\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.seatechnology.eu\/en\/wp-json\/wp\/v2\/comments?post=12173"}],"version-history":[{"count":0,"href":"https:\/\/www.seatechnology.eu\/en\/wp-json\/wp\/v2\/posts\/12173\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.seatechnology.eu\/en\/wp-json\/wp\/v2\/media\/12864"}],"wp:attachment":[{"href":"https:\/\/www.seatechnology.eu\/en\/wp-json\/wp\/v2\/media?parent=12173"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.seatechnology.eu\/en\/wp-json\/wp\/v2\/categories?post=12173"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.seatechnology.eu\/en\/wp-json\/wp\/v2\/tags?post=12173"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}